Da-Ke He, Ashish Jagmohan, et al.
ISIT 2007
In this note, we give a 1.47-approximation algorithm for the preemptive scheduling of jobs with release dates on a single machine so as to minimize the weighted sum of job completion times; this problem is denoted by 1|rj, pmtn|∑jwjCj in the notation of Lawler et al. Our result improves on a 2-approximation algorithm due to Hall et al. Math. Oper. Res. 22 (1997) 513-544, and also yields an improved bound on the quality of a well-known linear programming relaxation of the problem.
Da-Ke He, Ashish Jagmohan, et al.
ISIT 2007
Kenneth L. Clarkson, K. Georg Hampel, et al.
VTC Spring 2007
Kafai Lai, Alan E. Rosenbluth, et al.
SPIE Advanced Lithography 2007
W.C. Tang, H. Rosen, et al.
SPIE Optics, Electro-Optics, and Laser Applications in Science and Engineering 1991