Ruixiong Tian, Zhe Xiang, et al.
Qinghua Daxue Xuebao/Journal of Tsinghua University
The existence of a linear time approximation scheme for makespan minimization was demonstrated in the multiprocessor open shop problem with release dates. The approximation scheme was linear and didn't require solving linear program.
Ruixiong Tian, Zhe Xiang, et al.
Qinghua Daxue Xuebao/Journal of Tsinghua University
Simeon Furrer, Dirk Dahlhaus
ISIT 2005
Da-Ke He, Ashish Jagmohan, et al.
ISIT 2007
Joy Y. Cheng, Daniel P. Sanders, et al.
SPIE Advanced Lithography 2008