Robert F. Gordon, Edward A. MacNair, et al.
WSC 1985
The existence of a linear time approximation scheme for makespan minimization was demonstrated in the multiprocessor open shop problem with release dates. The approximation scheme was linear and didn't require solving linear program.
Robert F. Gordon, Edward A. MacNair, et al.
WSC 1985
Guo-Jun Qi, Charu Aggarwal, et al.
IEEE TPAMI
Yixiong Chen, Weichuan Fang
Engineering Analysis with Boundary Elements
Amir Ali Ahmadi, Raphaël M. Jungers, et al.
SICON