Simon S. Lam, Leonard Kleinrock
National Computer Conference AFIPS 1975
The delay performance of a Time Division Multiple Access (TDMA) channel for transmitting data messages is considered. The channel is assumed to be fixed assigned to a station with unlimited buffer capacity and Poisson message arrivals. Each message gives rise to one or more packets for transmission into fixed-length time slots. The steady-state probability generating function of the queue size is derived. Copyright © 1977 by The Institute of Electrical and Electronics Engineers, Inc.
Simon S. Lam, Leonard Kleinrock
National Computer Conference AFIPS 1975
Simon S. Lam
IEEE Transactions on Communications
Simon S. Lam, Y. Luke Lien
Computer Network Performance Symposium 1982
Leonard Kleinrock, Simon S. Lam
IEEE Transactions on Communications