J.P. Locquet, J. Perret, et al.
SPIE Optical Science, Engineering, and Instrumentation 1998
We consider the High-Multiplicity Cyclic Job Shop Scheduling Problem. There are two objectives of interest: the cycle time and the flow time. We give several approximation algorithms after showing that a very restricted case is APX-hard. © 2008 Elsevier B.V. All rights reserved.
J.P. Locquet, J. Perret, et al.
SPIE Optical Science, Engineering, and Instrumentation 1998
A. Gupta, R. Gross, et al.
SPIE Advances in Semiconductors and Superconductors 1990
Elizabeth A. Sholler, Frederick M. Meyer, et al.
SPIE AeroSense 1997
Timothy J. Wiltshire, Joseph P. Kirk, et al.
SPIE Advanced Lithography 1998