M.F. Cowlishaw
IBM Systems Journal
The preemptive job shop scheduling problem with two machines, with the objective to minimize the makespan is studied. An algorithm to find a schedule of length greater than the optimal schedule length is also discussed. The results showed that the maximum job length is bounded by a constant and algorithm finds a schedule whose length is within an additive constant of the optimal length.
M.F. Cowlishaw
IBM Systems Journal
Robert E. Donovan
INTERSPEECH - Eurospeech 2001
Gabriele Dominici, Pietro Barbiero, et al.
ICLR 2025
Khaled A.S. Abdel-Ghaffar
IEEE Trans. Inf. Theory