J.P. Locquet, J. Perret, et al.
SPIE Optical Science, Engineering, and Instrumentation 1998
The preemptive job shop scheduling problem with two machines, with the objective to minimize the makespan is studied. An algorithm to find a schedule of length greater than the optimal schedule length is also discussed. The results showed that the maximum job length is bounded by a constant and algorithm finds a schedule whose length is within an additive constant of the optimal length.