Conference paper
Failure diagnosis with incomplete information in cable networks
Yun Mao, Hani Jamjoom, et al.
CoNEXT 2006
The preemptive job shop scheduling problem with two machines, with the objective to minimize the makespan is studied. An algorithm to find a schedule of length greater than the optimal schedule length is also discussed. The results showed that the maximum job length is bounded by a constant and algorithm finds a schedule whose length is within an additive constant of the optimal length.
Yun Mao, Hani Jamjoom, et al.
CoNEXT 2006
Maciel Zortea, Miguel Paredes, et al.
IGARSS 2021
Jose Manuel Bernabe' Murcia, Alejandro Molina Zarca, et al.
Computing
Leo Liberti, James Ostrowski
Journal of Global Optimization